InspectAPedia ®

Building & Environmental Inspection, Testing, Diagnosis, Repair, & Problem Prevention Advice
Home | Air
Conditioning
| Electrical
-
Energy Saving
| Environment
Indoor
| Exteriors | Heating | Home
Inspection
| Insulate
-
Ventilate
| Interiors | Mold
Inspect/Test
| Plumbing
Water
Septic
| Roofing | Solar
Energy
| Structure | Contact Us
Directory of Professionals to Inspect or Test a Building


ELECTRICAL INSPECTION, DIAGNOSIS, REPAIR
ALUMINUM WIRING HAZARDS & REPAIRS
ALUMINUM WIRE FAILURE REPORTS
ALUMINUM WIRE RISK
  Aluminum Wiring Safety
  Aluminum Wiring - CPSC Publication #516
HOW TO RECOGNIZE ALUMINUM WIRING
HOW TO REDUCE THE RISK of ALUMINUM WIRING
  HOW TO REDUCE THE AL WIRE RISK: DETAILS
  COPALUM ALUMINUM WIRE CONNECTORS
  ALUMI-CONN ALUMINUM WIRE CONNECTORS
  ALUMINUM GROUND WIRES
  MAKING SPACE FOR ALUMINUM WIRE CONNECTORS
NOT-Recommended Repair Products
  CPSC Against Twist-On Aluminum Wire Connectors
  CPSC Letter Aluminum Wiring Connectors
  CPSC Twist-On Wiring Connectors Meeting Log
  Ideal 65 Connector for Aluminum Wire Repair?
  COALR & CU-AL Devices?
  Scotchlok 3M connector
Aluminum Wiring Repair Methods - CPSC Meeting 9/28/95
  Contents
  Copper Pigtailing
  Pigtailing failures
  Additional failures
  Field Failures
  Wire-to-wire Contact
  Equivalent Circuits
  Current Flow
  Connection Deterioration
  UL Test Inadequate
  "Special Connector" Failures
  AMP TYCO COPALUM
  Alternative Repair
  Special Concerns
BOOKSTORE - ELECTRICAL
DIRECTORY OF ELECTRICIANS - Aluminum Wiring
DIRECTORY OF ELECTRICIANS - FPE Zinsco
ALUMINUM WIRING ADVICE FOR RENTERS
ALUMINUM WIRING BIBLIOGRAPHY
Aluminum Wiring Notes for Home Inspectors
Aluminum Wiring Summary Page for Public Use
THERMAL EXPANSION of MATERIALS

More Information

InspectAPedia.comInspectAPedia ® Home & Site Map
InspectAPedia Blog - News Updates
Air Conditioning & Heat Pumps
Bookstore
Electrical
Environment
Exteriors
Heating
Home Inspection
Insulate Ventilate
Interiors
Mold Inspect/Test
Plumbing Water Septic
Roofing
Structure
Accuracy & Privacy Policies
Contact Us



Slide 27 overheating aluminum wire twist on connector failure photo Aluminum Wire: Copper to Aluminum Splice Deterioration Process and Consequence
InspectAPedia®  -    

  • Aluminum wire failure mechanisms
  • Why twist-on connectors overheat and lead to failures when used for copper to aluminum pigtailing
Our site offers impartial, unbiased advice without conflicts of interest. We will block advertisements which we discover or readers inform us are associated with bad business practices, false-advertising, or junk science. Our contact info is at InspectAPedia.com/appointment.htm.

This page continues the explanation of why twist-on connectors overheat and lead to failures when used for copper to aluminum pigtailing as an attempt at aluminum wiring repair. The observation explained here is that with this type of aluminum to copper wire splice, resistance increases between the copper and aluminum wires, leading to overheating of the connection and the twist-on the connector.

This is Aluminum Wiring Repair Procedure - Page 8 Color photos and descriptive captions from CPSC Meeting 9/28/95. In this document aluminum wire twist-on connector failures and repair procedures are described, including aluminum wire repair methods which work and methods which do not work and are unsafe.

Color photos of aluminum wire repair procedures, and photos of failed connectors are included. This document describes hazards with existing products, explains the aluminum wiring failure mechanism, and reviews recommended retrofit procedures including use of readily-available materials.

This information was presented to the US Consumer Product Safety Commission by Dr. J. Aronstein, 9/28/95. The minutes of that meeting were obtained under the Freedom of Information Act and posted by Daniel Friedman January 1996.

Click on the thumbnail sketches below to see each full-sized illustration.

Slide 25
25. As the aluminum-wired twist-on splices age, the wire-to-wire contact increases in resistance and may finally open altogether. The many wire-to-spring contacts also deteriorate (increase resistance) and some may also open completely, as shown in this equivalent circuit.




Slide 26
26. The deterioration process is observed experimentally as a slow but progressive increase in resistance, as the various current paths within the splice degrade. There are less parallel paths active through the spring, and the result can be a red-hot spring when current flows.




Slide 27
27. That is exactly what has happened here. All of the current is passing through only a few segments of the spring and those parts of the spring become red hot.

Text from attachment occurs here:

The CPSC Recommendation against the use of twist-on connectors for aluminum wire is soundly based. There is no reason to believe that the Ideal #65 connector, recently UL listed for aluminum-to-copper combinations, overcomes the fundamental deficiencies of this type of connection for applications with aluminum wire.
Page Down to See Rest of Text

The Ideal #65 connector has a zinc-plated steel spring. A combination known to be bad in contact with aluminum. Containing a free-burning oxide inhibitor grease, and having a free-burning thermoplastic shell, the connector can ignite readily if failures of the types shown here occur.

The only justification given for marketing this connector as suitable for aluminum wiring is that it has passed the test requirements of UL486C.

That the tests of UL486C are insufficient can be understood by considering the following table. [Table is on next page.]

Share this Article      

...

Technical Reviewers & References

Use links just below or at the left of each page to navigate this document or to view other topics at this website. Green links show where you are in our document or website.

Aluminum Wiring Repair Methods - CPSC Meeting 9/28/95
  Contents
  Copper Pigtailing
  Pigtailing failures
  Additional failures
  Field Failures
  Wire-to-wire Contact
  Equivalent Circuits
  Current Flow
  Connection Deterioration
  UL Test Inadequate
  "Special Connector" Failures
  AMP TYCO COPALUM
  Alternative Repair
  Special Concerns
ALUMINUM WIRING HAZARDS & REPAIRS
Aluminum Wiring Repair-
-Methods - CPSC Meeting 9/28/95
Aluminum Wire Risk
Reduce the Risk
Repair Details
DIRECTORY OF ELECTRICIANS - Aluminum Wiring
DIRECTORY OF ELECTRICIANS - FPE Zinsco
Other Products
Detailed Article

Books & Articles on Building & Environmental Inspection, Testing, Diagnosis, & Repair

ALUMINUM WIRING HAZARDS & REPAIRS

More Information

InspectAPedia.comInspectAPedia ® Home & Site Map
InspectAPedia Blog - News Updates
Air Conditioning & Heat Pumps
Bookstore
Electrical
Environment
Exteriors
Heating
Home Inspection
Insulate Ventilate
Interiors
Mold Inspect/Test
Plumbing Water Septic
Roofing
Structure
Accuracy & Privacy Policies
Contact Us

More Information on Building Diagnostic Inspections and Repairs

    ...
InspectAPedia.comInspectAPedia® Home & Site Map - Building & Environmental Inspection, Testing, Diagnosis, Repair, & Problem Prevention Advice: In-depth research & advice on diagnosing, testing, correcting, & preventing building defects & indoor environmental hazards. Unbiased information, no conflicts of interest.
GO TO the MOLD and INDOOR ENVIRONMENT INFORMATION CENTER for in-depth advice on avoiding testing for or cleaning up mold and other indoor environmental hazards, odors, gases, contaminants
The Mold Information Center:
What to Do About Mold in Buildings, When and How to Inspect for Mold, Clean Up Mold, or Avoid Mold Problems
GO TO MOLD TEST KITS: This expert-recommended mold test kit is cheap and yet top performing *IF* you use a competent analysis laboratory!
Use this simple, economical mold test kit
by following our instructions on how to collect and mail mold samples to our lab
GO TO IAQ/MOLD-TEST LAB SERVICES: Mold, Pollen, indoor air quality, field and laboratory services by an expert.Environmental Inspection, Testing, & Diagnosis On-Site IAQ, Gas, Air Testing, Mold Investigation, Sick Building Diagnosis, Lab Services, & Remediation Plan Preparation - indoor air quality testing, problem source determination, supporting lab work, written remediation plan addressing removal of environmental and other hazards and prevention of their recurrence.
GO TO our PRE PURCHASE BUILDING INSPECTION SERVICES: Authoritative information for home buyers and home owners is included with your inspection.
Building Inspection, Problem Diagnosis
, Forensic Investigation & Testing, Repair Consulting

CONTACT Daniel Friedman - Dan is a senior ASHI home inspector, nationally recognized expert on building inspection, building failures, and sick building investigation
Contact Daniel Friedman for website content suggestions or for fee-paid consulting

03/02/2009 - 01/31/1996 - InspectAPedia.com/aluminum/pl2p8.htm - © 2010 - 1988 Copyright Daniel Friedman All Rights Reserved - InspectPedia® is a Registered U.S. Trademark