InspectAPedia ® | ||||||||||||||||||||||||||
| Building & Environmental Inspection, Testing, Diagnosis, Repair, & Problem Prevention Advice |
| |||||||||||||||||||||||||
| InspectAPedia Home |
| | Air Conditioning |
| | Electrical | | | Indoor Environment |
| | Exteriors | | | Heating | | | Home Inspection |
| | Insulate Ventilate |
| | Interiors | | | Mold Inspect/Test |
| | Plumbing Water Septic |
| | Roofing | | | Structure | | | Contact Us |
| Directory of Professionals to Inspect or Test a Building | ||||||||||||||||||||||||||
|
SEPTIC SYSTEMS HOME HOME BUYERS GUIDE to SEPTIC SYSTEMS SEPTIC SYSTEMS ONLINE BOOK SEPTIC SYSTEM SAFETY WARNINGS SEPTIC SYSTEM DESIGN BASICS SEPTIC SOIL & PERC TESTS SEPTIC TANK SIZE SEPTIC TANK DEPTH SEPTIC TANK TEES SEPTIC DRAINFIELD SIZE SEPTIC DRAINFIELD SHAPE SEPTIC CLEARANCES SEPTIC TANK PUMPING FREQUENCY SEPTIC TANK PUMPING PROCEDURE SEPTIC PUMPING REPAIR SEPTIC TREATMENTS STEEP SLOPE SEPTIC DESIGNS SEPTIC DESIGN ALTERNATIVES Wastewater Treatment Levels Wastewater Dispersal Methods Master List of Septic System Types AEROBIC SEPTIC SYSTEMS ATU Tank Sizes ATU Final Treatment ATU Certifications ATU Problems ATU Failure Rates, Costs ATU Maintenance Procedures Aerobic Septic Disinfectants- Calcium Hypochlorite Aerobic Septic Disinfectants-Pool Chlorine ATU Suppliers Continuous Flow, Suspended Growth Aerobics CESSPOOLS DRYWELLS SEPTIC EFFLUENT DISINFECTION SYSTEMS EVAPORATION-TRANSPIRATION SEPTIC SYSTEMS FIXED-FILM PROCESS SEPTIC SYSTEMS GRAVELLESS SEPTIC SYSTEMS LAGOON SEPTIC SYSTEMS PRESSURE DOSING SEPTIC SYSTEMS MEDIA FILTER SEPTIC SYSTEMS SEPTIC & GREYWATER FILTERS SEQUENCING BATCH SEPTIC SYSTEMS MOUND SEPTIC SYSTEMS RAISED BED SEPTIC SYSTEMS SAND BED SEPTIC SYSTEMS SEWAGE TREATMENT SYSTEMS TOILET ALTERNATIVES VEGETATED SUBMERGED SEPTIC BEDS WETLAND SEPTIC SYSTEMS ALTERNATIVE SEPTIC DESIGNERS ALTERNATIVE SEPTIC PRODUCTS SEPTIC INSPECTIONS SEPTIC SYSTEM DEFINITIONS SEPTIC FAILURE LAWSUIT SEPTIC REFERENCES SEPTIC CONSULTANTS SEPTIC AUTHORITIES SEPTIC SYSTEM BOOKS REFS CODES SEPTIC SYSTEM DESIGN MANUAL - Online More Information InspectAPedia® Home & Site Map Air Conditioning & Heat Pumps Bookstore Electrical Environment Exteriors Heating Home Inspection Insulate Ventilate Interiors Mold Inspect/Test Plumbing Water Septic Roofing Structure Accuracy & Privacy Policies Contact Us |
Aerobic Treatment Unit Tank Size RequirementsTypically a residential aerobic septic treatment unit does not run continuously, just as inflow to it is not continuous. ATU size or capacity is determined as for a conventional septic system, by allowing 50 to 100 gallons of wastewater per day per building occupant. Some jurisdictions require that the system minimum capacity accept 500 gallons of wastewater daily. Safe aerobic treatment tank size adviceA "safe" design size for an aerobic treatment tank that allows for temporary power outage (and thus loss of the aeration pump) is an aerobic treatment tank at least as large as the conventional tank that would have been required for a given site. Aerobic treatment tanks in cold climatesIf your ATU tank is being installed in a cold climate, it may be necessary to insulate the treatment tank (use 2" solid foam panels) to keep the tank temperature high enough (above 54 degF) for the aerobic processing to continue in cold weather. (Some thermophilic microorganisms require temperatures as high as 131 to 149 degF.) ATU Flow: Continuous or Intermittent Design Alternatives for Aerobic Septic SystemsTwo basic ATU designs provide for intermittent or continuous flow through the system. Intermittent flow aerobic septic systemsJust as most residential septic systems do not receive wastewater continuously but rather intermittently, the ATU may be designed to turn the aerator and agitator on and off as needed. Intermittent flow septic systems, including aerobic or aeration treatment designs are also called a "batch system" septic design approach. Continuous flow aerobic treatment system designsOther aerobic or aeration septic treatment systems, particularly aerobic systems which have to serve a larger facility where wastewater inflow may be continuous, may themselves operate continuously. Obviously these designs are called "continuous flow" aerobic treatment systems. ... Technical Reviewers & References
Use links just below or at the left of each page to navigate this document or to view other topics at this website. Green links show where you are in our document or website. SEPTIC SYSTEMS HOME Books & Articles on Building & Environmental Inspection, Testing, Diagnosis, & Repair
| ||||||
|
SEPTIC SYSTEMS HOME More Information InspectAPedia Blog - News Updates Air Conditioning & Heat Pumps Bookstore Electrical Environment Exteriors Heating Home Inspection Insulate Ventilate Interiors Mold Inspect/Test Roofing Plumbing Water Septic Structure Accuracy & Privacy Policies Contact Us |
More Information on Building Diagnostic Inspections and Repairs
|
10/23/2009 - 01/10/1995 - InspectAPedia.com/septic/AerobicTanks.htm - © 2009 - 1988 Copyright Daniel Friedman All Rights Reserved - InspectAPedia® is a Registered U.S. Trademark